Sir Adam Beck 2 Niagara Falls
Sir Adam Beck 2 is the largest hydroelectric facility in Ontario. It provides electricity of residents of Ontario and the eastern part of the United States that is generated from the Niagara River. Sir Adam Beck 2 is an example of a renewable, natural non polluting power source. Located along the Niagara Parkway between Niagara Falls and Queenston Heights Ontario.
Overview
Sir Adam Beck firmly believed that hydroelectricity should be affordable to everyone.
Address
14000 Niagara Pkwy
Niagara Falls, Ontario L0S 1J0